Conservation Works
St James Power Station
Addition and alteration works to St James Power Station, a national monument gazetted in 2009.
The national monument was retrofitted for conversion into a commercial office. The addition and alteration works for St James Power Station involves conservation works, introduction of new floor slabs, new passenger and service lifts, replacement of surface parking lots with landscaping, new linkways, new basement carpark and roofing works.
The project was completed in 2021.
AWARDS
- URA Architectural Heritage Awards 2022
- SIA Architectural Design Awards 2022
- WSH Performance (SHARP) Award 2021
- WSH Performance (SHARP) Award 2020
- BCA Green Mark Award 2020, Platinum