About Us

Bedok South Station (Contract T311)

Transportation Hubs

Bedok South Station (Contract T311)

Sub-contract for architectural works at Bedok South Station and Tunnels for Thomson-East Coast Line (TEL).

Bedok South Station consists of two underground levels and is designed as a Civil Defence Shelter Station. The station at-grade structure consists of entrances, lift and vent shafts, escape stairs and commuter facilities such as covered linkways which connect the station entrance structures to pick-up points, taxi and bus shelters.

The project is expected to be completed in 2024.

  • Share to: