Bedok South Station (Contract T311)

Sub-contract for architectural works at Bedok South Station and Tunnels for Thomson-East Coast Line (TEL).

Bedok South Station consists of two underground levels and is designed as a Civil Defence Shelter Station. The station at-grade structure consists of entrances, lift and vent shafts, escape stairs and commuter facilities such as covered linkways which connect the station entrance structures to pick-up points, taxi and bus shelters.

The project is expected to be completed in 2024.

OTHER INTERIOR : PROJECTS PROJECTS

bornova escort izmir eskort buca escort bayan escort buca bayan eskort denizli belek escort bayan eskort antalya side escort bayan antalya eskort bayanlar ankara eskortlar ankara escortlar ankara eskortlar